March 2018 at UBC

  • Mar 25, 2018
  • 1 min read

Interior progress is moving along on the UBC Life Science Building Seismic Upgrade. We're going to be moving on to exterior work on the entry plaza soon, but for in the meantime we're finishing up installation of concrete seismic drag struts along the interior to transfer loads to the new seismic beams previously installed.

Depending on the location, and accessibility, some drag struts have been case in place and poured and some applied via shotcrete. Check out some photos below:

UBC 2018 Drag Struts Forming
​ ​UBC 2018 Drag Struts
UBC 2018 Drag Strut Rebar
UBC 2018 Drag Strut Rebar
UBC 2018 Drag Struts

Featured Posts
Recent Posts
Follow Us
  • Facebook Classic
  • Twitter Classic
WHAT'S UP?
Burns Lake 4.jpg

Skins Spillway Seismic Upgrade

We just finished work at the Skins Spillway seismic upgrade project in Ootsa Lake, BC

This 2 month project included chipping scaling and washing to prep the slopes, then our crew drilled anchors and grouting, finally applying two layers of steel fibre dry mix shotcrete to complete the project in late September

RECENT POSTS
RECENT PROJECTS
canada-post-the-post-redevelopment-2018-

Vancouver Post Office Building Seismic Upgrade

 

We're working on foundation walls at the massive city block sized rehabilitation project of the historic Vancouver Post Office building

Hammersly Pump Station 4.jpg

Hammersly Pump Station

 

We finished work on the radius lining of Hammersly Pump Station in April. Shotcrete application was carried before and after installation of the pump screws.

Head Office: 100 - 19331 Enterprise Way, Surrey BC V3S 6J8

Tel: 604-575-2563  Fax: 604-575-3236   Lorne@LRutt.com

  • w-facebook
  • Twitter Clean
  • Facebook
  • Twitter
  • Instagram
  • LinkedIn - Black Circle
bottom of page