March 2018 at UBC

March 25, 2018

Interior progress is moving along on the UBC Life Science Building Seismic Upgrade. We're going to be moving on to exterior work on the entry plaza soon, but for in the meantime we're finishing up installation of concrete seismic drag struts along the interior to transfer loads to the new seismic beams previously installed.

 

Depending on the location, and accessibility, some drag struts have been case in place and poured and some applied via shotcrete. Check out some photos below:

 

 

 

 

Please reload

Featured Posts

Skins Spillway Plunge Pool Repair Project

September 28, 2019

1/10
Please reload

Recent Posts

November 16, 2018

Please reload

Follow Us
  • Facebook Classic
  • Twitter Classic
WHAT'S UP?
Burns Lake 4.jpg

Skins Spillway Seismic Upgrade

We just finished work at the Skins Spillway seismic upgrade project in Ootsa Lake, BC

This 2 month project included chipping scaling and washing to prep the slopes, then our crew drilled anchors and grouting, finally applying two layers of steel fibre dry mix shotcrete to complete the project in late September

RECENT PROJECTS

Vancouver Post Office Building Seismic Upgrade

 

We're working on foundation walls at the massive city block sized rehabilitation project of the historic Vancouver Post Office building

Hammersly Pump Station

 

We finished work on the radius lining of Hammersly Pump Station in April. Shotcrete application was carried before and after installation of the pump screws.

RECENT POSTS

Skins Spillway Plunge Pool Repair Project

September 28, 2019

1/10
Please reload

Head Office: 17739 56A Avenue, Surrey BC V3S1G4

Tel: 604-575-2563  Fax: 604-575-3236   Lorne@LRutt.com

  • w-facebook
  • Twitter Clean
  • Facebook
  • Twitter
  • Instagram
  • LinkedIn - Black Circle