Major seismic repairs are in the works for the Alexandra Bridge located approximately 40 km North of Hope, BC. The 490 metre long bridge spans across the Fraser river, and sees a significant amount of local and tourist traffic throughout the year along Highway 1.

At its highest point, the Alexandra bridge rises almost 300 feet above the Fraser River. We'll be working on overhead shotcrete soffit repairs to the underside of the concrete bridge deck. Access will be challenging, but of course our team is always up for it!

We'll be working with other crews, and our portion will likely span from April to June 2018. You can read more about the enter Alexandra Bridge repair here: https://news.gov.bc.ca/releases/2017TRAN0071-000581

Featured Posts
Recent Posts
Follow Us
  • Facebook Classic
  • Twitter Classic
WHAT'S UP?
Burns Lake 4.jpg

Skins Spillway Seismic Upgrade

We just finished work at the Skins Spillway seismic upgrade project in Ootsa Lake, BC

This 2 month project included chipping scaling and washing to prep the slopes, then our crew drilled anchors and grouting, finally applying two layers of steel fibre dry mix shotcrete to complete the project in late September

RECENT POSTS
RECENT PROJECTS
canada-post-the-post-redevelopment-2018-

Vancouver Post Office Building Seismic Upgrade

 

We're working on foundation walls at the massive city block sized rehabilitation project of the historic Vancouver Post Office building

Hammersly Pump Station 4.jpg

Hammersly Pump Station

 

We finished work on the radius lining of Hammersly Pump Station in April. Shotcrete application was carried before and after installation of the pump screws.

Head Office: 100 - 19331 Enterprise Way, Surrey BC V3S 6J8

Tel: 604-575-2563  Fax: 604-575-3236   Lorne@LRutt.com

  • w-facebook
  • Twitter Clean
  • Facebook
  • Twitter
  • Instagram
  • LinkedIn - Black Circle
bottom of page