top of page
Search

Progress at UBC

  • lruttcontracting
  • Jun 9, 2017
  • 1 min read

We're making progress at UBC finishing up preparations for new seismic shotcrete walls to be put in place. We've been busy with dowel drilling and installation, surface preparation of the existing concrete, and pouring new concrete footings to reinforce the old ones so that the new seismic walls can be started.

Comentários


Featured Posts
Recent Posts
Follow Us
  • Facebook Classic
  • Twitter Classic
bottom of page